Flooring and Tiling (Continued)

The flooring has taken about 30 man hours to do so far, and we're about 3 hours from being done. We used reused flooring, so it was slightly harder than using new flooring. We have laid approximately 500 sq ft.

I've been doing this with my father, who has been cutting the wood pieces to length. Meanwhile, I've been installing the pieces.

Deb has been doing the tiling. She says that the process so far has taken about 24 hours. But, as you can see, she's included a lot of artistic flare, using many smaller tiles, which takes much longer than a conventional tile job.