Today was the final day of framing.
Here's a walk through of the framing work, including short explanations of staggered studs, thermal bridging, space efficiency.
Here's a homemade 'music video' of the crew putting the final window into place.
The design/build steps involved in the construction of an 'Accessory Dwelling Unit' in Portland, Oregon. Check out the online class
Showing posts with label framing. Show all posts
Showing posts with label framing. Show all posts
Monday, May 30, 2011
Wednesday, May 25, 2011
The Second Floor and Roof Sheathing
This video series shows the sheathing, facia board, interior and exterior walls, the stair design, and more!
Thursday, May 19, 2011
Framing
The Framing has begun. Amazingly, this phase is only going to take 7-10 working days, but will result in what will look like a house. I won't be able to keep up with the pace of this framing crew, but will certainly post pictures and videos as I'm able.
The first day of framing was incredible. Before my very eyes, the structure that I had been seeing in SketchUp models and in my mind's eye for months, was crystallizing into a solid, beautiful, purpose-filled form.
Here's a four minute video that shows the Balloon framing process during the first day.
Here are some pictures of the framing.
The first day of framing was incredible. Before my very eyes, the structure that I had been seeing in SketchUp models and in my mind's eye for months, was crystallizing into a solid, beautiful, purpose-filled form.
Here's a four minute video that shows the Balloon framing process during the first day.
Here are some pictures of the framing.
Subscribe to:
Posts (Atom)
