Two weeks ago, my architect submitted the drawing to the City of Portland for review. Two weeks later, we got our plan review meeting. I asked my architect and builder to both be there. I told them I would keep my mouth shut for fear that I may something stupid. The architect was to take the lead, since they were his drawings and he knew them better than anyone. My nerves caused me to shake.
This meeting was three months and $3,500 in the making. I probably shouldn't have been so nervous. If there were problems, we only had to address them in a permit revision to be approved. Nonetheless, I felt nervous.
The lead planning reviewer had first reviewed the permit that morning. Having had them for two weeks, I had thought that everyone would have already reviewed them. But, the plans couldn't be reviewed by the structural engineer until the planner signed off on them.
At 1pm, we sat down in with the reviewers, who ushered us in; no smiles. The planner reviewer looks over the brims of her glasses, and said that the ADU was 860 sq ft. It needed to be downsized to 800 sq ft to pass her planning review.
In describing their math, she mentioned quickly that the stair space was counted twice, once for each floor. I had to open my mouth to ask whether I understood her correctly. She confirmed what she had stated. To this, I explained that we had been told differently. My architect then said that he had an email from a planner stating that stairs were not counted twice. He seemed to brush off the critique.
Though she found this apparently glaring error, she said that she saw no other problems with it. This was a relief, because I felt pretty confident that we would be able to prove that the structure was very deliberately designed to be under 800 sq ft according to the stated rules.
Next, if/when the plans past planning, they still needed to be reviewed by the structural engineer. Once they're through structural, we'll get the permit.
So, it had been two weeks already, but even if we had passed planning immediately right then and there, they would still need about ten more working days to complete the permit process. We hadn't gotten a straight answer about that one, so this was news to us. I had assumed that we could potentially walk out of there with a permit in hand, but this wasn't the case.
That evening, last night, my architect sent out a brilliant, humble and short email with a dimensioned drawing to show the sq foot calculations. He attached the email that he had received from the city stating that the stairs would not be counted twice.
This morning, the planner replied to my architect in a e-mail, "I concur with your measurements", she wrote , "So I can sign off on the permit."
It was music to my eyes.
Structural, Bring it. :)
The design/build steps involved in the construction of an 'Accessory Dwelling Unit' in Portland, Oregon. Check out the online class
Showing posts with label architect. Show all posts
Showing posts with label architect. Show all posts
Wednesday, March 30, 2011
Sunday, February 27, 2011
Still designing
The design process has been incredibly enlightening. And time consuming. I plan to write about it extensively, but needless to say, I've been humbled by the amount of aspects of a well built home that I didn't understand.
Meanwhile, I am taking an intensive 96 hour class called the Sustainable Homes Professional course, which has added an entire new perspective to my process.
At this stage, the architect and I have had at least 10 hours of meetings and phone conversations, 15 schematic drawings, 200-300 email exchanges, and countless hours of playing around with the floor plans and models on our time.
I'm super psyched about what we've come up with for the floor plan. The plans are currently being worked on by the structural engineer.
In five days, I'll meet with the architect, and the builder that I've selected, and we will pass the design build torch.
Next week, I'll be submitting the drawings for a permit through the City of Portland.
Meanwhile, I am taking an intensive 96 hour class called the Sustainable Homes Professional course, which has added an entire new perspective to my process.
At this stage, the architect and I have had at least 10 hours of meetings and phone conversations, 15 schematic drawings, 200-300 email exchanges, and countless hours of playing around with the floor plans and models on our time.
I'm super psyched about what we've come up with for the floor plan. The plans are currently being worked on by the structural engineer.
In five days, I'll meet with the architect, and the builder that I've selected, and we will pass the design build torch.
Next week, I'll be submitting the drawings for a permit through the City of Portland.
Friday, December 17, 2010
Hiring an Architect to Get the Stamp
Next, I sent out this model to three architects with CAD design skills who could put these plans into CAD in a format that would pass muster with Portland Bureau of Development Services. I chose the architect who came in with a reasonably priced bid ($2k) for this design work.
Despite my attempts to make a solid design, my architect made some significant changes to the floor plan in order to simplify the plan and minimize the overall square footage.
Here's his first cut at designing the first floor in CAD.
And here's the 2nd floor.
There are some more design changes underway. I've decided to put the bathroom on the 2nd floor instead of the first floor. But, this is more or less the general design of the property.
Despite my attempts to make a solid design, my architect made some significant changes to the floor plan in order to simplify the plan and minimize the overall square footage.
Here's his first cut at designing the first floor in CAD.
And here's the 2nd floor.
There are some more design changes underway. I've decided to put the bathroom on the 2nd floor instead of the first floor. But, this is more or less the general design of the property.